Tuesday, 19 November 2013

How to make a Hydra ROV

How to make a Hydra ROV by Interspec

 
 
 
 
IMG_0933.JPG
 
 
 
IMG_0946.JPG
 
 
The ocean is indeed a mysterious and fascinating area of research and until recently the ocean depths have
remained largely unexplored. Extreme levels of pressure, negligible light levels and frigid temperatures are
conditions that make unaided exploration impossible. With the onset of the industrial age and the
development of specialized robotics, the ocean depths are now finally being researched. The study of the
ocean presents opportunities for biologists, oceanographers, and engineers. Robotics is playing an advancing
role in exploration, construction, and monitoring in subsea environments. In particular, underwater remotely
operated vehicles (ROV) play a critical role of underwater operations.

ROV is a tethered underwater robot, common in deepwater industries. ROVs are unoccupied, highly
maneuverable and operated by a person aboard a vessel. They are linked to the deck by a tether, a group of
cables that carry electrical power, video and data signals back and forth between the operator and the vehicle
Industrial underwater ROVs have enormous production costs due mainly in part to expensive specialized
underwater components. The cost of such an ROV is typically much too high for students, school or hobbyists
to incur. In order to increase student interest in oceanography and engineering, Interspec R&D has indentified
a market opportunity to develop underwater vehicles that can be deployed in educational environments with
goal of increasing student exposure to this technology.

Interspec R&D is a local company that is involved in the design & development of mini ROV systems,
underwater cameras including concepts in diver equipment housings and sub-sea Lighting systems. Interspec
has offered the students at the University of Victoria an opportunity to develop the electronics and software
for a modular control system that for a new ROV prototype. Collaboration between Interspec and the
University of Victoria is a powerful partnership and both groups offer unique expertise in different areas of
engineering.

Well will be publishing our project in steps so stay tuned

our web www.interspec.org and blog.interspec.org and you can post your own projects at
http://www.facebook.com/groups/133693978008/
 
 

Wednesday, 13 November 2013

Build a Motorized Surfboard

 


            
These plans are some of the strangest we've seen yet. They are for a surfboard-type craft coupled with a gas engine to cruise over the waves.
THERE'S something new in water-sports equipment — a motor-driven paddle board. It combines the common characteristics and seaworthiness of the surfboard and paddle board, but, more than that, it's power driven by a conventional outboard motor.
That's the new angle. Smooth, sweeping "hull" lines, crowned deck and low motor hatch make this the sleekest, trimmest little craft you ever looked at. Light enough to be easily launched by one person, it rides rough water like a cork.
The hull, or board, itself is constructed just like the nonpower jobs, except that it is 5Vi in. deep instead of the usual 3 in. or so on the conventional surfboard and paddle board. Deck and outboard plan views shown in Fig. 3 give the general over-all dimensions.
Note that the motor hatch is placed well forward, giving ample room for a tall man to lie full length aft of it. Controls consist of tiller and speed lever, and a clear plastic transom permits a view inside the "engine room" from the rear.
This, together with a midget headlight, could be lighted from a small storage battery for night cruising....
Build a Motor Board



Read More Info

Friday, 8 November 2013

Gill 12 Tugboat


 
 
 
 

Please note Mike Gill is an amateur small boat designer and like many of us, has no formal naval engineering background. But he has designed a cute little boat and has generously agreed to offer the plans for free here.
Included in the zipped folder are:
  1. the building sequence (below)
  2. 13 construction photos
  3. 9 drawings or dimensioned photos
Photos:

Hull panels and transom cutout and ready to be stitched together.

Bow, Bulkhead detail as hull is assembled.

Hull panels, bulkheads stitched together.

Hull glassed, PVC pipe rails being installed.

Fordeck fitted.

Wheelhouse foundation ready for epoxy and tape.

PVC rail corner before epoxy.

Hull ready for wheelhouse, bench seats.

Transom detail, 2x6 support ready for taping.

Wheelhouse stitched for taping.

Wheelhouse construction.

Wheelhouse pieces.

Painted and ready for launch
click images to enlarge
Drawings:
Here is the suggested building sequence:
  1. Loft bottom (keel) panel. Mark centerline and all station lines boldly. Use 14-ft flexible batten to connect loft points. Make pattern for one side of hull bottom and use to duplicate other side to assure symmetry.
  2. Loft lower chine panels (port and starboard). Mark all station lines boldly.
  3. Loft upper chine panels (port and starboard). Mark all station lines boldly.
  4. Loft sheer panels (port and starboard). Mark all station lines boldly.
  5. Loft transom. Mark centerline and all lines boldly.
  6. Loft station #3 bulkhead. Mark centerline and all lines boldly.
  7. Loft station #6 bulkhead. Mark centerline and all lines boldly.
  8. Loft station #9 bulkhead. Mark centerline and all lines boldly.
  9. Review all lofting geometry for accuracy and cut panels. Stack-cut lower chine panels, upper chine panels and sheer panels.
  10. Use saber saw to make a quarter-inch cut to mark all station lines and centerline  locations on the edges of all bulkheads, hull panels and transom. Use the small cuts to boldly draw station lines on both sides of ALL panels, bulkheads and transom.
  11. Using two layers of four-inch fiberglass cloth tape (6oz.) and epoxy, tape (splice) respective panels together on both sides.
  12. All panels and bulkheads should now be ready for hull assembly.
  13. Place bottom panel on assembly work surface and use scrap lumber to position bulkheads #3, #6 and #9 accurately in place with drywall screws. Scrap 1x2 or 1x4 pieces may be used to keep bulkheads straight, true and erect. Eliminate bends, bows and curves in bulkheads.
  14. Using #16 copper wire, stitch bottom chine panels in place with bottom panel. Make certain all station lines are aligned.
  15. Using a saber saw, cut three-inch slices from the front (stem) to station #1 to allow the wood to make the severe lower bow bend.
  16. Stitch the bottom bow pieces together using heavy copper wire. Take care to keep panels straight, aligned and bow stem plum with all centerlines.
  17. Carefully twist-tighten wire stitches pulling bottom panel and lower chine panels together. Double check alignment and station line relationships.
  18. Use thickened epoxy to make fillets and begin interior seam taping process. Fillets and tape should be applied at the same time to eliminate much sanding.
  19. Use four-inch fiberglass tape and epoxy to weld all interior seams together. Take great care to assure proper alignment of panels.
  20. Stitch upper chine panels to lower chine panel and bulkheads using #16 copper wire.
  21. Stitch transom into place using great care to assure proper alignment.
  22. Stitch sheer panels into place using #16 copper wire.
  23. Cut transom to provide proper inward angle for sheer panel.
  24. At this time you should see the entire hull assembly.
  25. Begin taping all interior hull seams using two layers of four-inch fiberglass tape and epoxy.
  26. Apply two additional layers of tape and epoxy over all panel splice locations.
  27. After every interior hull seam has been welded with epoxy and tape, double check hull alignment. Look for twists and correct any abnormalities or misalignments.
  28. Install one and one-half-inch PVC schedule 40 cap rail. The pipe must be sliced lengthwise on a table saw to allow the pipe to slide over the sheer panel. The pipe must be sliced vertical nearly halfway through every 2 inches to allow the pipe to make the necessary bends from bow to transom .
  29. Using two layers of six-inch fiberglass tape, epoxy sheer cap rail into place. Double check alignment.
  30. Sand cap rail, checking for fiberglass splinters.
  31. Carefully roll hull upside down.
  32. Use epoxy filler to fill all cracks, holes, seams and gaps.
  33. Sand hull seams. Smooth and round all corners.
  34. Use two layers of four-inch fiberglass tape and epoxy all exterior hull seams including all bow slices.
  35. Sand taped seams smooth.
  36. Use 38 inch wide cloth and epoxy two layers of cloth over entire hull. Overlap cloth layers at both chines, bow and transom. Take care applying epoxy to avoid bubbles in cloth. 
  37. Cut a 10-foot piece of one and one-half inch PVC schedule 40 pipe in half for keel. Tapered angles should be cut at both ends of pipe. Center half-pipe keel on centerline between stations #1 to #11. Use several temporary drywall screws to hold keel in place. Fill tapered ends with epoxy filler.
  38. Cut a five-foot piece of one and one-quarter inch PVC schedule 40 pipe in half for outboard keelsons. Both pieces will be used for outboard keelsons positioned between station #4 to #9. Tapered angles should be cut at both ends of pipe. The outboard keelsons should be positioned 14.5 inches from outside edge of center keel. two identical pieces of scrap strips of wood 14.5 inches long placed between centerline keel and outboard keel as spacers will assure alignment until pipe is secured. Use a few pieces of fiberglass tape and epoxy to tack keels in place. Fill tapered ends with epoxy filler. Round edges and fiberglass with cloth and epoxy.
  39. Double check alignment. Remove all drywall screws. Use three layers of fiberglass tape and epoxy to encapsulate the PVC keels to the hull. The PVC pipe serves as keelson and external I beam to stiffen hull bottom. Care should be taken to make certain lamination is solid.
  40. Cut one and one-quarter inch PVC schedule 40 pipe in half for lower sheer rub rail. Relief cuts must be made every two inches to allow required bends in pipe.
  41. Using drywall screws, secure pipe rub rail in place on both sides of hull centering pipe rub rail along lower sheer seam.
  42. When rub rail is aligned, tack in place with fiberglass tape and epoxy.
  43. Remove drywall screws. Two layers of six-inch fiberglass tape and epoxy shall be used to encapsulate pvc rub rails to hull.
  44. Fill and sand hull smooth for paint.
  45. Hull may now be flipped right-side-up.
  46. Cap all sheer rail ends (PVC pipe) and sheer cap with epoxy filler and cover with several layers of fiberglass cloth and epoxy.
  47. Using 38-inch cloth, epoxy two layers of cloth to hull interior, encapsulating all wood surfaces.
  48. Cut four-inches from top of bulkhead at station #3 and #6 in preparation for deck.
  49. Cut bulkhead at station #9 to given dimensions.
  50. Using scrap pieces of luan, fashion pattern for one half of forward deck from bow to bulkhead at station #6 using hull centerline as splice point.
  51. Scribe pattern on luan and cut to fit with pattern to complete forward deck shape. Check for alignment and fit.
  52. Mark location of PVC forward deck bow support and epoxy into place with several layers of cloth (see photo).
  53. Cut second half of forward deck, mate with first half and check for fit into hull.
  54. When you are satisfied with fit, mark all station locations boldly on both sides of deck and splice two halves together.
  55. Cut  five (5) pieces 22”x 4” luan for wheelhouse attachment collar. Tape together and position on deck in preparation for wheelhouse cutout location. (see photos)
  56. When geometry is completed for wheelhouse attachment collar, cut out deck and epoxy and tape collar into place.
  57. Place 1” PVC half-pipe stiffeners on underside of deck and epoxy and tape in place.
  58. Sand fordeck and doublecheck for proper fit.
  59. Fillet deck/hull seam and follow with tape and epoxy.
  60. Cut five (5) luan panels for wheelhouse sides. Builder may want to duct tape the panels in place to check fit, alignment and personal taste. Window size may vary. The wheelhouse should be assembled to be removed.
  61. Roof panels cut and cambered roof beams cut to fit.
  62. Wheelhouse panels and roof sewn together with copper wire and assembled to check fit. Trim to builder’s taste.
  63. Wheelhouse taped and encapsulated with epoxy and cloth in the same fashion as the hull. Wheelhouse should fit over the attachment collar like a shoebox lid.
  64. Cut 2x6 helm vertical support to be bolted at centerline of station #3 to receive ship’s wheel. Cut to desired height and round top. Steering pulleys and cable system may now be aligned and temporarily located.
  65. Cut and fit 2x6 transom support and motor mount. Epoxy and encapsulate with cloth. Drain hole and plug installed through bottom of 2x6 vertical support between motor mount and hull bottom.
  66. Cut and fit 2x6 cockpit bench seats. Bench seats to span between bulkhead #6 and transom with bulkhead #9 cut to support middle of bench. Each bench comprised of three pieces of 2x6 spaced ¾ inch apart. 2x4 rails bolted to bulkhead #6 to support bench. Aft end of benches supported by transom motor mount span.
  67. Sand hull and prep for paint. Interior of hull coated with two-part epoxy garage floor paint kit from Home Depot.
  68. Exterior hull painted with Petit Easypoxy (Gloss Black) product. Deck painted with beige acrylic latex house paint. Wheelhouse painted with Petit Easypoxy (Gloss White).
  69. Tug is designed for no more than 10 horsepower outboard.    


Read More

Thursday, 7 November 2013

Hovercraft

Universal Hovercraft 13PT

   
The UH-13PT twin trainer is our simplest 2-passenger hovercraft featuring direct drive engines for simplicity and a virtually unsinkable foam core hull. The UH-13PT hovercraft makes an excellent father/son, high school or university learning project. The 13PT is perfect for beginners with little building experience and veterans looking to add a fun machine to their collection. Builders will learn composites, mechanics, aerodynamics, fiberglass and wood working. No welding required.

This is a twin engine hovercraft; it uses a 10 to 15 hp (Tecumseh, Briggs, Kohler, Honda or Robin) horizontal shaft thrust engine to turn a 36 inch 2-blade propeller and a 5 to 7 hp vertical shaft lift engine turning a 24 inch 4-blade lift fan. Both engines are direct drive.

The pointed design produces less planing drag and less high speed drag than a craft of equal size with a square front end. This translates into a higher payload capacity, low-power cruising, and a higher top speed. A single joystick controls two flexible rudders and thrust engine throttle. Lift throttle is mounted on the dashboard.

An entry level racing class has been formed for beginner to intermediate competitors by the Hoverclub of America. This class is based around the 13PT design. 15 hp is the maximum allowed horsepower (lift engine + thrust engine). See
Hoverclub of America racing for more information.

Watch the video below to see Cary Grove High School's UH-13PT in action at the National Hoverally. Look for the green craft, number 88.




Specifications
Capacity2 Persons
Payload500 Lbs
Speed40 mph
Hover Height8 inches
Length13 ft 6 in
Width6 ft 2 in
Empty Weight300 Lbs
Flotation1500 Lbs
Climb Gradient20 to 30%
Engines5 to 7 hp lift (under 35 Lbs), 8 to 15 hp thrust (under 65 Lbs)
Construction MethodFoam and Plywood Composite
Construction Time125 hours

UH-13PT Kit Contents
Engine Kit
10 HP Tecumseh horizontal shaft
5 HP Tecumseh vertical shaft

Hull Kit**
1 sheet of 1” foam
6 sheets of 2” foam
6 sheets of 1/8” plywood
**Must be shipped by truck or ocean.

Hardware Kit
UH-13PT Plans
1.5 Gallon epoxy kit
2-pump kit
4 yards of 3.25 oz. Fiberglass cloth
7 yards of 6 oz. Fiberglass cloth
8 yards of skirt material
300 skirt screws
½ pint HH-66 skirt glue
36’ Steering cable



Source